Thursday, 24 February 2022

Digital Medicine for Heart (Heart can be recycled without cardiac transplant)

 


Digital Medicine for Heart

(Heart can be recycled without cardiac transplant)


Ultra modern English medicine without knife and blood.


*1) No angiogram *


2) No bypass surgery


3) No angioplasty or stent


Two super modern machines have been discovered

1)CT-700

2)EECP


1) The most modern machine called CT-700 has been discovered to detect heart blockage without angiogram..


Two minutes is enough for this.

No need to stay in hospital for this


This cost is also less

This is done in two places only in Chennai.


Early heart blockage detection in early stages

There is a great chance of healing through pills..


And that now

2) Heart can be cured and recycled without bypass surgery and stent through the sophisticated machine called EECP.


Government approved medical system


To know the truth

* Sri Vivekananda Hospital *

Chennai

08925015666

08778463371

09500037040

04443192129


DR.G. Vivekanandan in Doctors Conference Interview

This is the news published


Millions of diabetes and heart patients benefited from this.



Friday, 11 February 2022

IRMS - INDIAN RAILWAY MANAGEMENT SERVICE

 1 Indian Railway Service of Engineers


2 Indian Railway Service of Mechanical Engineers


3 Indian Railway Service of Electrical Engineers


4 Indian Railway Stores Service


5 Indian Railway Service of Signal Engineers


6 Indian Railway Traffic Service


7 Indian Railway Personnel Service


8 Indian Railway Accounts Services


Following Group ‘A’ services from Civil Services and Engineering Services are going to be linked with IRMS. It is a different cadre produced by Indian Railways.


CSE Group ‘A’ Services


Indian Railway Traffic Services


Indian Railway Accounts Services


Indian Railway Personnel Services


Indian Railway Protection Force Services


Combined Engineering Services (ESE)


Indian Railway Service of Engineer


Indian Railway Stores Service which is Civil, Mechanical, Electrical, Telecommunication, Electronics Engineering Posts.


Indian Railway Services of Mechanical Engineers


Indian Railway Service of Electrical Engineer


Indian Railway Service of Signal Engineer

6 Corridors in Hyderabad Metro Phase-II

6 Corridors in Hyderabad Metro Phase-II Total 116.2 kms. Estimated cost is Rs.32,237 crores Hyderabad Metro Rail Limited (HMRL) has concep...